The following are photos showing the construction of the site.
December 4-10, 2011: Here are some new photos. Parking lot South 2 is now completed, marked, and cleared.
View from grass between Parking Lot South 1 and South 2
Parking Lot South 2, Kennedy Campus tower and CC South Building.

And, Parking Lot South 2, looking east
3rd floor hallway and furniture stacking
Lower commons
Media center carpeted
North building looking from 3rd floor of south building
Recording studios on lower level
Touching up red wall on 1st floor
Restroom ready for use. (boys blue/red tiles on wall; always on left)
Skywalk and parking lots seen from 3rd floor
Culinary equipment
Cosmetology furniture in place
View from upper commons to south. Media Center to left. Big staircase at back
Sedum roof (seen from 3rd floor) in place
Science classroom taking shape
Nov. 14, 2011: Here are photos of the buildings after Veteran's Day.
Almost everything is locked up on the south building now.
Sidewalks poured out front and plantings going in
This stairway is being completed.
Student bathrooms are almost finished.
Science stations being installed.
Lockers installed in cosmetology
Inside of Ms. Tuttle's office taking shape
Long classroom hallway with color accents
Lots of doors ready for installation
Library computer lab has floor tiles down
Data cabling is being pulled
Glass block tiles have been laid in cosmetology
Cosmetology stations on other side of glass block tiles
Shot taken from student parking lots looking south. A nice night-time view
Oct. 27, 2011: Welcome to the end of first quarter. See new pictures below, again, with captions beneath.
This shot is taken from the student parking lots, looking to the south. Pedestrian plaza is to the right; Kennedy Campus Tower is in the center with Career Center South behind it. Service road that will serve Career Center North as well as Kennedy's kitchen is in the center of the photo. Career Center North is to the left.
Tower picture taken from shop entrance driveways of the north building. This really is an interesting structure.
Remember that Career Center South will be partially covered with a green roof? Here is it---trays of sedum ready for installation.
First floor entrance to Career Center South. This driveway comes off Highland and curves between CC and Kennedy to get to faculty parking lots. Notice the skywalk leading from North Parking Lots (Steps on the right end will get student to ground level if they prefer not entering at 2nd floor.
Exterior Library detail. This side of the building faces Highland Avenue.
Good looking group visited the site this past Saturday